top of page

BUS CONVERSION 

one step at a time

Search

STATE of the ART

I am so close! Bus is 95% done and its now parked in a functional hookup with a deck built beside it. I am struggling to complete,...

Bedroom completion

I finally did a little push and finally completed one room! The bedroom, the most difficult area due to tight quarters and the curved...

Finally a table!

It all started with a plan... And a plank that was routed to plan... This was then filled with black epoxy It was sanded flat and...

Project Review

Good time to take a round of photos... I am still loving all that storage! Entering into the living Room. Counter is now on the top of...

Finished up TV cabinet in the bedroom

I see in the previous post I already had a few things done. But it really started a little further back with this: To that I added first...

BEDROOM details to finsh

This side of the bedroom needs some work next. Then to finish all minor trim pieces and painting detailing. Only after that I will put a...

BEDROOM BLACKOUT

I created these sliding panels with some help of our shop CNC machine. They are 1/2" mdf with a piece of hardwood embedded on the...

KITCHEN PROGRESS

I got some more trim installed and painted. Also got an awesome piece of real artwork done by a friend Jillian. You can see her artwork...

Been trimming and painting....

Over the holidays I got a lot of trim done. Got this doorway trimmed. Also got two other doors built and one installed. Also got the...

Bedroom Ceiling

The challenge in this area was to cover all the metal fittings on a ceiling that was curved both ways. I solved it by making brackets to...

In the pink...

The colored lights are allot of fun. I tend to like the blues and purple but here is some pink. I have been poking along at it. I did get...

BEEN A WHILE

I have been working on other things for a while but have made a little progress. I have finished up much of the electric, got all AC...

Shower Panel install

After a final couple coats of gloss urethane it is time to bring shower panels and attempt an install. I test fit the first one and it...

Shower Wall Adventure 2

By the time I got to the final pour on the second half of the shower, I had done one test pour, two pours on the floor, and three on the...

Shower Wall Adventure

Pouring shower walls was going to be a bit more of a challenge. Not only were there two halves that I wanted to align together but I...

LIGHTING

I liked the continuous led lighting in my last bus but I wanted this one to be even better. I decided to run it the whole length of both...

Finished Floor

I ended up pouring a second layer over the floor. There were a couple adjustments I wanted to make. So most of it I poured in clear but...

A quick tour

CLICK to see video. A brief walk thru the bus done the other day after I got some lighting hooked up.

Couch Adventure

I shop ahead a bit as sometimes it is hard to find just what I need. I REALLY did not want to do one of those custom upholstered couches...

bottom of page